Load Testing and NDT Inspections

NDE Offshore helped out with the following:NDE Offshore was chosen in September 2025 to perform post-load testing non-destructive inspections on Seafox Burj after a recent crane load test. Contact usThe NDE Offshore teamutilized Magnetic Particle Inspection (MPI) and Eddy Current Testing (ECT) as part of their inspection plan.Contact usThe recent load testing and advanced inspections […]
UTG testing and ECI inspection

NDE Offshore helped out with the following:Ultrasonic Thickness Gauging (UTG) – commenced in November 2025 to verify tank thickness Contact usOffshore rope accessOur rope access technicians carefully performs Eddy Current Inspection (ECI) of the barge legsContact usOur techniciansPerformed Eddy Current Inspection (ECI) of the barge legsContact us Seafox 8 2025 WORK DESCRIPTION: Ultrasonic Thickness Gauging […]
Rope Access/NDT inspection 2025

NDE Offshore helped out with the following:Rope Access and NDT inspection Contact usOffshore rope accessOur rope access technicians carefully remove the rust and prepare the structure for a new coating of paint.Contact usOur techniciansPerformed post load testing inspection of the cranes. MPI and ECT inspection. Contact us Seafox 8 2025 WORK DESCRIPTION: Post load testing inspection […]
Rope Access, NDT and painting 2025

WORK DESCRIPTION:
Rope Access NDT work on the helideck structure, forward bulkhead and legs. The SOW was UTG, ECT, MPI and painting.
Helideck Installation 2021

WORK DESCRIPTION: Fabrication & Installation of new helideck including Commissioning after installation:
Topside/Rope Access 2019-2020

WORK DESCRIPTION:
Dismantling of helideck on offshore converter station:
Offshore retrofit installation campaign, Globaltech I 2019

WORK DESCRIPTION:
Offshore retrofit installation campaign:
Periodic inspections of helidecks on offshore converter platforms 2019

WORK DESCRIPTION:
Periodic inspections of helidecks on offshore converter platforms
Offshore retrofit installation campaign 2018

WORK DESCRIPTION:
Offshore retrofit installation campaign
Combined structural inspection and maintenance campaign 2018

WORK DESCRIPTION:
Combined structural inspection and maintenance campaign
Periodic inspections of helidecks on offshore converter platforms 2018

WORK DESCRIPTION:
Periodic inspections of helidecks on offshore converter platforms
Offshore retrofit installation campaign 2018

WORK DESCRIPTION:
Periodic inspections of helidecks on offshore converter platforms