Topside Rope Access ref – NDE Offshore https://ndeoffshore.com We offer complete turn-key solutions to the offshore Oil & Gas and Renewable energy industry Fri, 16 Jan 2026 10:02:39 +0000 en-US hourly 1 https://wordpress.org/?v=6.8.5 https://ndeoffshore.com/wp-content/uploads/2024/06/cropped-icon_NDE_Offshore-32x32.png Topside Rope Access ref – NDE Offshore https://ndeoffshore.com 32 32 Load Testing and NDT Inspections https://ndeoffshore.com/blog/load-testing-and-ndt-inspections/ Fri, 16 Jan 2026 09:46:51 +0000 https://ndeoffshore.com/?p=6973
NDE Offshore helped out with the following:
NDE Offshore was chosen in September 2025 to perform post-load testing non-destructive inspections on Seafox Burj after a recent crane load test.
Contact us
The NDE Offshore team
utilized Magnetic Particle Inspection (MPI) and Eddy Current Testing (ECT) as part of their inspection plan.
Contact us
The recent load testing and advanced inspections
conducted on Seafox Burj cranes have reinforced the company’s commitment to safety, reliability, and regulatory compliance
Contact us

Seafox Burj 2025

WORK DESCRIPTION: 

  • Magnetic Particle Inspection (MPI)
  • Eddy Current Testing (ECT)

Type of work:

NDE Offshore selected for post-load testing Non-Destructive Testing (NDT) inspection following recent crane load testing.

Period: Sept-Oct 2025
Location: Qatar
Platform: Seafox Burj

Email us for inquiries:

Are you interested in learning more about this project?
Contact: rfq@ndeoffshore.com 

]]>
UTG testing and ECI inspection https://ndeoffshore.com/blog/utg-testing-and-eci-inspection/ Fri, 16 Jan 2026 08:14:37 +0000 https://ndeoffshore.com/?p=6951
NDE Offshore helped out with the following:
Ultrasonic Thickness Gauging (UTG) – commenced in November 2025 to verify tank thickness
Contact us
Offshore rope access
Our rope access technicians carefully performs Eddy Current Inspection (ECI) of the barge legs
Contact us
Our technicians
Performed Eddy Current Inspection (ECI) of the barge legs
Contact us

Seafox 8 2025

WORK DESCRIPTION: 

  • Ultrasonic Thickness Gauging (UTG) – commenced in November 2025 to verify tank thickness
  • Eddy Current Inspection (ECI) on barge legs

 

Type of work: UTG testing and ECI inspection

Period: Nov/Dec
Location: Qatar
Platform: Seafox Burj

Email us for inquiries:

Are you interested in learning more about this project?
Contact: rfq@ndeoffshore.com 

]]>
Rope Access/NDT inspection 2025 https://ndeoffshore.com/blog/rope-access-ndt-inspection-2025/ Mon, 15 Sep 2025 08:25:39 +0000 https://ndeoffshore.com/?p=6178
NDE Offshore helped out with the following:
Rope Access and NDT inspection
Contact us
Offshore rope access
Our rope access technicians carefully remove the rust and prepare the structure for a new coating of paint.
Contact us
Our technicians
Performed post load testing inspection of the cranes. MPI and ECT inspection.
Contact us

Seafox 8 2025

WORK DESCRIPTION: 

Post load testing inspection conducted of the cranes. Rope access/ MPI and ECT inspection.   

Type of work: Rope Access/NDT inspection

Period: July/August
Location: Qatar
Platform: Seafox 8

Email us for inquiries:

Are you interested in learning more about this project?
Contact: rfq@ndeoffshore.com 

]]>
Rope Access, NDT and painting 2025 https://ndeoffshore.com/blog/rope-access-ndt-and-painting-2025/ Mon, 28 Apr 2025 10:21:43 +0000 https://ndeoffshore.com/?p=5687
NDE Offshore helped out with the following:
NDT work, through UTG, MPI, painting and cleaning work
Contact us
Offshore rope access
Our rope access technicians carefully remove the rust and prepare the structure for a new coating of paint.
Contact us
Our technicians
Conducted maintenance and repair work on the helideck structure, forward bulkhead, and the legs.   
Contact us

Seafox Frontier 2025

WORK DESCRIPTION: 

Rope Access NDT work on the helideck structure, forward bulkhead and legs. The SOW was UTG, ECT, MPI and painting.

Type of work: Rope Access, NDT and painting

Period: 14 Days
Location: Dubai, UAE
Platform: Seafox Frontier

Email us for inquiries:

Are you interested in learning more about this project?
Contact: rfq@ndeoffshore.com 

]]>
Helideck Installation 2021 https://ndeoffshore.com/blog/helideck-installation/ Sun, 23 Jun 2024 08:00:58 +0000 https://ndeoffshore.com/?p=1717

SIEMENS 2021

WORK DESCRIPTION: Fabrication & Installation of new helideck including Commissioning after installation:

  • Project management and planning Engineering and Fabrication of helideck structure.
  • Installation and Commissioning of new helideck Crane operations.

Period: Mars 2021 – June 2021
Location: North Sea, German Sector
Field: MRJN 690 and 26
Wind farm: HelWin Alpha

Email us for inquiries:

Are you interested in learning more about this project?
Contact: rfq@ndeoffshore.com 

]]>
Topside/Rope Access 2019-2020 https://ndeoffshore.com/blog/topside-rope-access-2/ Sun, 23 Jun 2024 07:30:08 +0000 https://ndeoffshore.com/?p=2248
IRATA technician

SIEMENS 2019-2020

WORK DESCRIPTION: 

Dismantling of helideck on offshore converter station:

  • Project management and planning
  • Dismantling of complete helideck structure
  • Crane operations

Type of work: Topside/Rope Access
Period: Oct-19 – Jan-20
Location: North Sea, German Sector
Platform: HelWin Alpha

Email us for inquiries:

Are you interested in learning more about this project?
Contact: rfq@ndeoffshore.com 

]]>
Offshore retrofit installation campaign, Globaltech I 2019 https://ndeoffshore.com/blog/offshore-retrofit-installation-campaign/ Sun, 23 Jun 2024 07:00:54 +0000 https://ndeoffshore.com/?p=2280

Globaltech I 2019

WORK DESCRIPTION: 

Offshore retrofit installation campaign:


• Project management and planning
• WROV installation of subsea components
• Rope Access installation support
• ROV and Dive support

Type of Work: WROV/Diving/Rope Access
Period: July-August
Location: North Sea, German Sector
Windfarm: Globaltech I
Vessel: Edda Fjord

Email us for inquiries:

Are you interested in learning more about this project?
Contact: rfq@ndeoffshore.com 

]]>
Periodic inspections of helidecks on offshore converter platforms 2019 https://ndeoffshore.com/blog/periodic-inspections-of-helidecks-on-offshore-converter-platforms/ Sun, 23 Jun 2024 06:30:48 +0000 https://ndeoffshore.com/?p=2317

SIEMENS 2019

WORK DESCRIPTION: 

Periodic inspections of helidecks on offshore converter platforms:
• Project management and planning
• Rope Access inspection of helideck structure
• Bolt inspection

 

Type of Work: Topside/Rope Access
Period: April-June
Location: North Sea, German Sector
Windfarm: BorWin Beta, HelWin Alpha, & SylWin Alpha

Email us for inquiries:

Are you interested in learning more about this project?
Contact: rfq@ndeoffshore.com 

]]>
Offshore retrofit installation campaign 2018 https://ndeoffshore.com/blog/offshore-retrofit-installation-campaign-2/ Sun, 23 Jun 2024 06:10:54 +0000 https://ndeoffshore.com/?p=2350

Globaltech I

WORK DESCRIPTION: 

Offshore retrofit installation campaign:
• Project management and planning
• WROV installation of subsea components
• Rope Access installation support
• ROV and Dive support

Type of Work: WROV/Diving/Rope Access
Period: May – Sep
Location: North Sea, German Sector
Windfarm: Globaltech I
Vessel: Edda Fjord

Email us for inquiries:

Are you interested in learning more about this project?
Contact: rfq@ndeoffshore.com 

]]>
Combined structural inspection and maintenance campaign 2018 https://ndeoffshore.com/blog/combined-structural-inspection-and-maintenance-campaign/ Sun, 23 Jun 2024 06:00:20 +0000 https://ndeoffshore.com/?p=2359

OCEAN BREEZE 2018

WORK DESCRIPTION: 

Combined structural inspection and maintenance campaign:
• Project management and planning
• Structural inspection and maintenance above water (transition piece and foundation)
• ROV inspection of wind turbine substructure and OSS

Type of Work: Topside/Rope Access/ROV
Period: May – Sep
Location: North Sea, German Sector
Windfarm: BARD I
Vessel: Ocean Zephyr

Email us for inquiries:

Are you interested in learning more about this project?
Contact: rfq@ndeoffshore.com 

]]>