References – NDE Offshore https://ndeoffshore.com We offer complete turn-key solutions to the offshore Oil & Gas and Renewable energy industry Fri, 16 Jan 2026 10:02:39 +0000 en-US hourly 1 https://wordpress.org/?v=6.8.5 https://ndeoffshore.com/wp-content/uploads/2024/06/cropped-icon_NDE_Offshore-32x32.png References – NDE Offshore https://ndeoffshore.com 32 32 Load Testing and NDT Inspections https://ndeoffshore.com/blog/load-testing-and-ndt-inspections/ Fri, 16 Jan 2026 09:46:51 +0000 https://ndeoffshore.com/?p=6973
NDE Offshore helped out with the following:
NDE Offshore was chosen in September 2025 to perform post-load testing non-destructive inspections on Seafox Burj after a recent crane load test.
Contact us
The NDE Offshore team
utilized Magnetic Particle Inspection (MPI) and Eddy Current Testing (ECT) as part of their inspection plan.
Contact us
The recent load testing and advanced inspections
conducted on Seafox Burj cranes have reinforced the company’s commitment to safety, reliability, and regulatory compliance
Contact us

Seafox Burj 2025

WORK DESCRIPTION: 

  • Magnetic Particle Inspection (MPI)
  • Eddy Current Testing (ECT)

Type of work:

NDE Offshore selected for post-load testing Non-Destructive Testing (NDT) inspection following recent crane load testing.

Period: Sept-Oct 2025
Location: Qatar
Platform: Seafox Burj

Email us for inquiries:

Are you interested in learning more about this project?
Contact: rfq@ndeoffshore.com 

]]>
UTG testing and ECI inspection https://ndeoffshore.com/blog/utg-testing-and-eci-inspection/ Fri, 16 Jan 2026 08:14:37 +0000 https://ndeoffshore.com/?p=6951
NDE Offshore helped out with the following:
Ultrasonic Thickness Gauging (UTG) – commenced in November 2025 to verify tank thickness
Contact us
Offshore rope access
Our rope access technicians carefully performs Eddy Current Inspection (ECI) of the barge legs
Contact us
Our technicians
Performed Eddy Current Inspection (ECI) of the barge legs
Contact us

Seafox 8 2025

WORK DESCRIPTION: 

  • Ultrasonic Thickness Gauging (UTG) – commenced in November 2025 to verify tank thickness
  • Eddy Current Inspection (ECI) on barge legs

 

Type of work: UTG testing and ECI inspection

Period: Nov/Dec
Location: Qatar
Platform: Seafox Burj

Email us for inquiries:

Are you interested in learning more about this project?
Contact: rfq@ndeoffshore.com 

]]>
Rope Access/NDT inspection 2025 https://ndeoffshore.com/blog/rope-access-ndt-inspection-2025/ Mon, 15 Sep 2025 08:25:39 +0000 https://ndeoffshore.com/?p=6178
NDE Offshore helped out with the following:
Rope Access and NDT inspection
Contact us
Offshore rope access
Our rope access technicians carefully remove the rust and prepare the structure for a new coating of paint.
Contact us
Our technicians
Performed post load testing inspection of the cranes. MPI and ECT inspection.
Contact us

Seafox 8 2025

WORK DESCRIPTION: 

Post load testing inspection conducted of the cranes. Rope access/ MPI and ECT inspection.   

Type of work: Rope Access/NDT inspection

Period: July/August
Location: Qatar
Platform: Seafox 8

Email us for inquiries:

Are you interested in learning more about this project?
Contact: rfq@ndeoffshore.com 

]]>
Rope Access, NDT and painting 2025 https://ndeoffshore.com/blog/rope-access-ndt-and-painting-2025/ Mon, 28 Apr 2025 10:21:43 +0000 https://ndeoffshore.com/?p=5687
NDE Offshore helped out with the following:
NDT work, through UTG, MPI, painting and cleaning work
Contact us
Offshore rope access
Our rope access technicians carefully remove the rust and prepare the structure for a new coating of paint.
Contact us
Our technicians
Conducted maintenance and repair work on the helideck structure, forward bulkhead, and the legs.   
Contact us

Seafox Frontier 2025

WORK DESCRIPTION: 

Rope Access NDT work on the helideck structure, forward bulkhead and legs. The SOW was UTG, ECT, MPI and painting.

Type of work: Rope Access, NDT and painting

Period: 14 Days
Location: Dubai, UAE
Platform: Seafox Frontier

Email us for inquiries:

Are you interested in learning more about this project?
Contact: rfq@ndeoffshore.com 

]]>
SAT Diving for Spool & Riser installation, Touchdown Monitering, As-Lay Inspection 2023 https://ndeoffshore.com/blog/sat-diving-for-spool-riser-installation-touchdown-monitering-as-lay-inspection/ Sun, 23 Jun 2024 08:55:44 +0000 https://ndeoffshore.com/?p=1698

Ocentra/Hilong 2023/2024

WORK DESCRIPTION: ROV Pipelay touch-down monitoring, SAT diving for Spool installation, Riser Clamp replacement, Riser installation and J-Tube installation, ROV as-lay inspection.

  • Project management, planning, and execution of projects.
  • Purchase and sourcing of material and equipment.
  • SAT Diving, installation.
  • ROV Inspection & Survey.
  • Pipe Lay Support.

Period: July 2023 – August 2023
Location: Marjan Field, KSA
Field: MRJN 690 and 26

Email us for inquiries:

Are you interested in learning more about this project?
Contact: rfq@ndeoffshore.com 

]]>
Pre-Con & Touchdown Survey 2023 https://ndeoffshore.com/blog/pre-con-touchdown-survey/ Sun, 23 Jun 2024 08:53:36 +0000 https://ndeoffshore.com/?p=1715
Ship: astro aquilla

Ocentra/Hilong 2023/2024

WORK DESCRIPTION: ROV Pipelay touch-down monitoring, SAT diving for Spool installation, Riser Clamp replacement, Riser installation and J-Tube installation, ROV as-lay inspection.

  • Project management, planning, and execution of projects.
  • Purchase and sourcing of material and equipment.
  • SAT Diving, installation.
  • ROV Inspection & Survey.
  • Pipe Lay Support.

Period: Mars 2021 – June 2021
Location: Marjan Field, KSA
Field: MRJN 690 and 26

Email us for inquiries:

Are you interested in learning more about this project?
Contact: rfq@ndeoffshore.com 

]]>
Removal of test piles 2022 https://ndeoffshore.com/blog/removal-of-test-piles/ Sun, 23 Jun 2024 08:15:42 +0000 https://ndeoffshore.com/?p=1951

GLOBALTECH I 2022

WORK DESCRIPTION: 

The second campaign to remove installed test piles used for monitoring seabed conditions

  • Project management and planning
  • Using WROV and Pile cutting/Recovery equipment removal of piles from deck
  • Disposal of piles after completion of the project
  • Seabed Survey after job completion

Period: May
Location: North Sea, Germany
Wind farm: Globaltech I
Vessel: Oceanic Allseas

Email us for inquiries:

Are you interested in learning more about this project?
Contact: rfq@ndeoffshore.com 

]]>
Grab monitoring with ROV to prevent subsea object being damaged during sampling 2022 https://ndeoffshore.com/blog/grab-monitoring-with-rov-to-prevent-subsea-object-being-damaged-during-sampling/ Sun, 23 Jun 2024 08:10:09 +0000 https://ndeoffshore.com/?p=1964

AQUABIOTA

WORK DESCRIPTION: 

Grab monitoring with ROV to prevent subsea objects from being damaged during sampling.


• Project management, planning, and execution of the project
• Seabed GVI Survey
• Grab Monitoring

Type of Work: ROV Observation
Period: July 2022
Location: Sweden
Wind farm: Finngrundet, Fyrskeppet
Vessel: N/A

Email us for inquiries:

Are you interested in learning more about this project?
Contact: rfq@ndeoffshore.com 

]]>
Removal of Test piles. Vessel: Horizon Enabler. 2022 https://ndeoffshore.com/blog/removal-of-test-piles-vessel-horizon-enabler/ Sun, 23 Jun 2024 08:05:23 +0000 https://ndeoffshore.com/?p=2204

GLOBALTECH I 2022

WORK DESCRIPTION: 

Removal of installed test piles used for monitoring seabed conditions

  • Project management and planning
  • Using WROV and Pile cutting/Recovery equipment removal of piles from deck
  • Disposal of piles after completion of the project
  • Seabed Survey after job completion

Period: May
Location: North Sea, Germany
Wind farm: Globaltech I
Vessel: Oceanic Allseas

Email us for inquiries:

Are you interested in learning more about this project?
Contact: rfq@ndeoffshore.com 

]]>
Helideck Installation 2021 https://ndeoffshore.com/blog/helideck-installation/ Sun, 23 Jun 2024 08:00:58 +0000 https://ndeoffshore.com/?p=1717

SIEMENS 2021

WORK DESCRIPTION: Fabrication & Installation of new helideck including Commissioning after installation:

  • Project management and planning Engineering and Fabrication of helideck structure.
  • Installation and Commissioning of new helideck Crane operations.

Period: Mars 2021 – June 2021
Location: North Sea, German Sector
Field: MRJN 690 and 26
Wind farm: HelWin Alpha

Email us for inquiries:

Are you interested in learning more about this project?
Contact: rfq@ndeoffshore.com 

]]>